春节快乐!
我们将在 2 月 1 日至 8 日期间休假,并将于2 月 9 日恢复办公。

S&A CW-3000TG Thermolysis Industrial Water Chiller (AC220V 50Hz) for 60W or 80W CO2 Glass Laser Tube
单件价格
COP 833,019
/件
批量折扣
数量
折扣
单价
1
10%
COP 833,019
总费用
COP 925,577
COP 833,019
数量
/件
1
春节快乐!
我们将在 2 月 1 日至 8 日期间休假,并将于2 月 9 日恢复办公。

S&A CW-3000TG Thermolysis Industrial Water Chiller (AC220V 50Hz) for 60W or 80W CO2 Glass Laser Tube
单件价格
COP 833,019
/件
批量折扣
数量
折扣
单价
1
10%
COP 833,019
总费用
COP 925,577
COP 833,019
数量
/件
1
We are authorized as "S&A" brand name product agent.
All of S&A water chillers are certified with design patent. Counterfeiting is not allowed,
Please recognize S&A logo when you purchase S&A water chillers.

S&A CW-3000 series thermolysis type water cooler has compact design,with energy saving,high cost performance,good protection and alarm system.
This Water Chiller has been sold largely to Europe, South America, Asia and other markets;
Economic cooling equipment, easy to install and operate, compact and easily movable.
Used for:

| Model | SIT-CW-3000TG | ||
|---|---|---|---|
| Voltage | AC 1P 220V | ||
| Frequency | 50/60Hz | ||
| Current | 0.45A | ||
| Machine power | 0.10KW | ||
| Radiating capacity | 50W/℃ | ||
| Max.lift | 10M | ||
| Max.flow | 10L/min | ||
| N.W | 9.5Kgs | ||
| G.W | 12Kgs | ||
| Protection | flow alarm | ||
| Tank capacity | 9 L | ||
| Inlet and outlet | OD 10mm barbed connector | ||
| Dimension | 49X27X38 cm (L X W X H) | ||
| Package dimension | 59X39X48 cm (L X W X H) | ||

Ease of moving and water filling.
The firm handle can help move the water chillers easily.
Inlet and outlet connector equipped. Multiple alarm protection.
The laser will stop working once it receives alarm signal from the water chiller for protection purpose.
High speed fan of famous brand installed.
Adopt SAN JU brand from Taiwan with quality assurance and low failure rate.
Easy water draining
It is suggested to replace the cooling water(distilled water or purified water as cooling water) every 3 to 6 months.
Water outlet of the water tank connects to water inlet of the laser machine while water inlet of the water tank connects to water outlet of the laser machine. Aviation connector of the water tank connects to the aviation connector of the laser machine.

In order to guarantee the equipment will not be damaged while cooling water circulation is out of control, CW-3000series water cooler possess a low flow alarm protection.

Causes of the cooling water circulation alarm and the working condition table

Note: The flow alarm is connected to the normally open relay and normally closed relay contacts, requiring operating current less than 5A, working voltage less than 300V.

Drain the waste water out of the water tank through the drain outlet and fill the clean water into the tank through the filling hole

The purified water should be exchanged once a month and the running water should be exchange twice a month. The quality of the circulating water will directly influence the service life the laser tube.It is recommended to use purified water.

S&A CW-3000 chiller for 3KW CNC spindle machine

S&A CW-3000 water cooler for 60W co2 laser machine

S&A CW-3000 chiller for dual 1.5KW engraving machine

S&A CW-3000 chiller for 80W co2 laser cutting machine

S&A CW-3000 chiller for acrylic laser cutting machine

With 11 patent certificates and won Quality integrity Level A certificate; ISO 9001, CE, RoHS and REACH environmental certificated. Conforms to air transport requirements, energy saving and environment friendly.


18,000 square meters brand new industrial refrigeration system research center and production base ,Strictly execute ISO production management system, using mass modularized standard produces, and standard parts rate up to 80% which are the source of quality stability.
Annual production capacity of 60,000 units, focus on large, medium and small power chiller production and manufacture.


With excellent laboratory testing system, simulates actual working environment for chiller. Overall performance testing before delivery: aging test and complete performance test must be executed on each finished chiller.


It is very simple to install this industrial cooling machine. The first time installation of the new machine can be carried out by following steps.
Open the package to check if the machine is intact and all the necessary accessories are completed. |
Open the injection port to feed cooling water. (Do not let the water spill over!) |
According to system conditions, please connect the water inlet and outlet pipe well. |
Plug in power, turn on the power switch. (Do not start up without water in the water tank!)(2) After the first boot, you must immediately check whether the water pipe leaks. |
Check the water level of the water tank again. (It should be 80-150cm from the surface of water to the injection port) |

Please ensure that the power supply and electrical outlet are in good contact and the earth wire must be firmly grounded! |
Please make sure there is stable and normal voltage for the working chiller! |
Unmatched power frequency can cause the chiller damage! |
To protect the pump, it’s strictly forbidden to run the chiller without water in the storage water tank!To drain through circulating pump is strictly prohibited! |
Please be sure that the air inlet and air outlet are in good ventilation! |
The cooling water must be drained if the cooler is out of use for long time or before being transported. |
|

| Failure | Failure Cause | Approach |
|---|---|---|
| Machine turned on but unelectrified | ||
| Power cord is not plugged in place | fuse burnt-out | |
| Plug the power cord in place | Replace the fuse inside the power interface which is in the back of machine | |
| Flow alarm (panel red light) with water pipe directly connect to the outlet, inlet, there is no water flow | Water level in the storage water tank is too low | Feed water and check the pipe leakage |
| When used with the device, flow alarm (panel red light), but a direct connection with the pipe outlet and inlet, there is water flowing but not alarming | Blockage in circulating water pipeline | Check circulating water pipeline |
| Ultra-high temperature | ||
| Chiller of poor ventilation | Excessive heat load | |
| To improve the ventilation | Reduce the heat load or to use other models | |
| A normal boot, but the fan does not work | The water temperature below 20 degrees | A normal phenomenon, no processing |
| Switch on with alarming after adding water or changing water | ||
| Water drop in electric circuit | Damaged pumps dry transfer | |
| Natural drying or drying off cap | To replace or repair water pumps,prohibited anhydrous boot | |
| Slow outfall drainage | The injection port is not open | Open the injection port |